Been wondering this as well. Seems like they ran out of funds and stopped.
Been wondering this as well. Seems like they ran out of funds and stopped.
Different partnership than Flamingo - sale of that had absolutely nothing to do with BH or capital issues. Last February we went through shake up on contractors and ended up hiring a new one and re-assessing some of the design. Spent the last 9 months re-working things and bringing back some design elements that hadn't made it into the first round that we wished had. Better project for it and we would prefer to get the project right before we build it. Partners are just as eager to get it going and look forward to site getting moving shortly.
Movement is happening again!
Just took these.
Moving fast.
The porches will be replaced with wood versions.
As much as having large 2nd floor patios would be, the building does look a bit lighter and better without them.
Wouldn't be surprised if they needed the brick from the porches to cover various other parts of the reconstructions. This is an unbelievable labor of love because it's clear this would have been much easier to just tear down altogether and build something new.
Pete, recommend you going back by here, construction is underway for the surrounding structure
Wow I totally missed the part about the additional structure(s).
Looking forward to seeing what sort of cool bar/lounge they come up with here.
Very curious about the additional structures.
I am very here for this, but am shocked there has been no outcry about the light parking
They paved the area behind the neighboring duplex for additional parking so there's something like 36 spaces on site. It's a boutique hotel with, what? 28 rooms? It seems proportional.
For what it's worth, I think they're doing an incredible job with this development; every detail has been well considered and I'd bet they've been equally thoughtful about the parking.
There are currently 1 users browsing this thread. (0 members and 1 guests)
Bookmarks