Widgets Magazine
Results 1 to 24 of 24

Thread: Airport Tunnel Project

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. Default Re: Airport Tunnel Project

    I walked through the tunnel yesterday and the moving sidewalk was shutdown as well with parts everywhere. It got me to thinking that the moving sidewalk is probably broken 50% of the time i walk through it.

  2. #2

    Default Re: Airport Tunnel Project

    Quote Originally Posted by ChargerAg View Post
    I walked through the tunnel yesterday and the moving sidewalk was shutdown as well with parts everywhere. It got me to thinking that the moving sidewalk is probably broken 50% of the time i walk through it.
    Actually I find that situation common in moving sidewalks in numerous airports.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Robinson Ave Tunnel completed for MAPS 3 Central Park Access
    By Urban Pioneer in forum Transportation
    Replies: 15
    Last Post: 10-07-2011, 03:40 PM
  2. Airport Help
    By Karried in forum Current Events & Open Topic
    Replies: 6
    Last Post: 11-14-2007, 01:44 PM
  3. Airport Parking
    By Jesseda in forum Businesses & Employers
    Replies: 2
    Last Post: 09-18-2007, 05:00 AM
  4. Tunnel under Crestwood neighborhood
    By metro in forum General Civic Issues
    Replies: 0
    Last Post: 04-25-2006, 03:40 PM
  5. Downtown tunnel project hits snag
    By Pete in forum General Civic Issues
    Replies: 3
    Last Post: 12-13-2005, 03:09 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO