Thread: Road Construction in Edmond

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1

    Default Road Construction in Edmond

    Thought it would be nice to have a thread on road construction in Edmond.

  2. #2

    Default Re: Road Construction Projects in Edmond

    "Kelly Avenue

    The street will be widened to a four-lane divided roadway with left turn lanes at all public streets and a traffic signal at Kelly and Prairie Village Drive, which will be a new entrance to J.L. Mitch Park, Mathis Skate Park and Cheyenne Middle Schools, said Tom Minnick, city traffic planner.

    Five-foot wide sidewalks are planned on both sides of Kelly"

    "Downtown resurfacing

    Monday, crews will resurface part of Broadway between Second Street and Campbell Avenue."

    Read more here: Motorists should be cautious of Edmond Road construction projects | News OK

  3. #3

    Default Re: Road Construction in Edmond

    ''Posted on: September 6, 2013
    Downtown Broadway to Be Resurfaced Monday

    Work to resurface the downtown stretch of Broadway is slated to begin Monday, September 9th at 7:00 pm. Work will continue throughout the evening until the project is completed.

    The area of Broadway to be resurfaced will be from 2nd Street to Campbell Avenue. The street will remain open during this time, but motorists should expect lane closures.

    Atlas Paving is the contractor for the overlay project''

    Edmond, OK - Official Website

  4. #4

    Default Re: Road Construction in Edmond

    ''Kelly, north of Covell to south of Coffee Creek
    The Kelly Avenue parkway road construction project will begin Wednesday, July 17, 2013. The Kelly Avenue widening will start approximately 1000 feet north of Covell and will continue north to a point 350 feet south of Coffee Creek. The street will be widened to provide a four-lane divided roadway with left turns at all public streets. There will be a new traffic signal light at Kelly and Prairie Village Drive which will also serve as an additional access point into Mitch Park, Mathis Skate Park, and Cheyenne Middle School. The project also includes street lighting and landscaping. There will be 5 foot wide sidewalks on both sides of Kelly.

    The first phase of the project is to construct a new bridge just south of Coffee Creek adjacent to the Coffee Creek Golf Course. This will require the closing of Kelly Avenue to through traffic. Local traffic will have access to Hunters Pointe, Hunters Creek, Prairie Village and Coffee Creek Additions from the south end of the project via Covell, while the Villas at Hunters Creek Addition and the Coffee Creek Golf Course will have access from the north end of the project via Coffee Creek. It is anticipated that phase one will require 125 days to complete at which time the road will re-open to through traffic while work on the rest of Kelly will proceed. Formal detour route signs will be posted.

    The Oklahoma Department on Transportation (ODOT) awarded the project to Duit Construction Company of Edmond in the amount of $5,934,304. Project funding is 80% federal funds and 20% city funds. ODOT will administer and inspect the project. Edmond will have personnel available on the job site as necessary. The total project duration is 250 calendar days.

    Periodic lane closures may be necessary for some of the construction activity. Motorists are advised to use extreme caution and obey traffic signs and flagmen while traveling through the work zone as workers and equipment will be present''

    - http://edmondok.com/index.aspx?NID=800

  5. #5

    Default Re: Road Construction in Edmond

    Quote Originally Posted by Plutonic Panda View Post
    ''Kelly, north of Covell to south of Coffee Creek
    The Kelly Avenue parkway road construction project will begin Wednesday, July 17, 2013. The Kelly Avenue widening will start approximately 1000 feet north of Covell and will continue north to a point 350 feet south of Coffee Creek. The street will be widened to provide a four-lane divided roadway with left turns at all public streets. There will be a new traffic signal light at Kelly and Prairie Village Drive which will also serve as an additional access point into Mitch Park, Mathis Skate Park, and Cheyenne Middle School. The project also includes street lighting and landscaping. There will be 5 foot wide sidewalks on both sides of Kelly.

    The first phase of the project is to construct a new bridge just south of Coffee Creek adjacent to the Coffee Creek Golf Course. This will require the closing of Kelly Avenue to through traffic. Local traffic will have access to Hunters Pointe, Hunters Creek, Prairie Village and Coffee Creek Additions from the south end of the project via Covell, while the Villas at Hunters Creek Addition and the Coffee Creek Golf Course will have access from the north end of the project via Coffee Creek. It is anticipated that phase one will require 125 days to complete at which time the road will re-open to through traffic while work on the rest of Kelly will proceed. Formal detour route signs will be posted.

    The Oklahoma Department on Transportation (ODOT) awarded the project to Duit Construction Company of Edmond in the amount of $5,934,304. Project funding is 80% federal funds and 20% city funds. ODOT will administer and inspect the project. Edmond will have personnel available on the job site as necessary. The total project duration is 250 calendar days.

    Periodic lane closures may be necessary for some of the construction activity. Motorists are advised to use extreme caution and obey traffic signs and flagmen while traveling through the work zone as workers and equipment will be present''

    - Edmond, OK - Official Website - Current Construction Projects
    Update: The bridge portion of this construction project is 75% complete. Underground storm water pipes are being installed on west side of Kelly.

  6. #6

    Default Re: Road Construction in Edmond

    Quote Originally Posted by Plutonic Panda View Post
    ''Kelly, north of Covell to south of Coffee Creek
    The Kelly Avenue parkway road construction project will begin Wednesday, July 17, 2013. The Kelly Avenue widening will start approximately 1000 feet north of Covell and will continue north to a point 350 feet south of Coffee Creek. The street will be widened to provide a four-lane divided roadway with left turns at all public streets. There will be a new traffic signal light at Kelly and Prairie Village Drive which will also serve as an additional access point into Mitch Park, Mathis Skate Park, and Cheyenne Middle School. The project also includes street lighting and landscaping. There will be 5 foot wide sidewalks on both sides of Kelly.

    The first phase of the project is to construct a new bridge just south of Coffee Creek adjacent to the Coffee Creek Golf Course. This will require the closing of Kelly Avenue to through traffic. Local traffic will have access to Hunters Pointe, Hunters Creek, Prairie Village and Coffee Creek Additions from the south end of the project via Covell, while the Villas at Hunters Creek Addition and the Coffee Creek Golf Course will have access from the north end of the project via Coffee Creek. It is anticipated that phase one will require 125 days to complete at which time the road will re-open to through traffic while work on the rest of Kelly will proceed. Formal detour route signs will be posted.

    The Oklahoma Department on Transportation (ODOT) awarded the project to Duit Construction Company of Edmond in the amount of $5,934,304. Project funding is 80% federal funds and 20% city funds. ODOT will administer and inspect the project. Edmond will have personnel available on the job site as necessary. The total project duration is 250 calendar days.

    Periodic lane closures may be necessary for some of the construction activity. Motorists are advised to use extreme caution and obey traffic signs and flagmen while traveling through the work zone as workers and equipment will be present''

    - Edmond, OK - Official Website - Current Construction Projects
    *Update: The contractor opened the road to thru traffic on 1-17-14. There is one thru lane for both north and south directions. The contractor will now begin removing the old pavement on the east side of Kelly and complete the cross drains before modifing the soil and placing additional asphalt.

    - Edmond, OK - Official Website - Current Construction Projects

  7. #7

    Default Re: Road Construction in Edmond

    Quote Originally Posted by Plutonic Panda View Post
    ''Kelly, north of Covell to south of Coffee Creek
    The Kelly Avenue parkway road construction project will begin Wednesday, July 17, 2013. The Kelly Avenue widening will start approximately 1000 feet north of Covell and will continue north to a point 350 feet south of Coffee Creek. The street will be widened to provide a four-lane divided roadway with left turns at all public streets. There will be a new traffic signal light at Kelly and Prairie Village Drive which will also serve as an additional access point into Mitch Park, Mathis Skate Park, and Cheyenne Middle School. The project also includes street lighting and landscaping. There will be 5 foot wide sidewalks on both sides of Kelly.

    The first phase of the project is to construct a new bridge just south of Coffee Creek adjacent to the Coffee Creek Golf Course. This will require the closing of Kelly Avenue to through traffic. Local traffic will have access to Hunters Pointe, Hunters Creek, Prairie Village and Coffee Creek Additions from the south end of the project via Covell, while the Villas at Hunters Creek Addition and the Coffee Creek Golf Course will have access from the north end of the project via Coffee Creek. It is anticipated that phase one will require 125 days to complete at which time the road will re-open to through traffic while work on the rest of Kelly will proceed. Formal detour route signs will be posted.

    The Oklahoma Department on Transportation (ODOT) awarded the project to Duit Construction Company of Edmond in the amount of $5,934,304. Project funding is 80% federal funds and 20% city funds. ODOT will administer and inspect the project. Edmond will have personnel available on the job site as necessary. The total project duration is 250 calendar days.

    Periodic lane closures may be necessary for some of the construction activity. Motorists are advised to use extreme caution and obey traffic signs and flagmen while traveling through the work zone as workers and equipment will be present''

    - Edmond, OK - Official Website - Current Construction Projects
    **April 2014 Update: The contractor has finished laying the concrete for the northbound traffic lanes and is currently pouring concrete for the southbound traffic lanes after that they will be pouring the side street approaches and curbing the center median as well as building the sidewalks, street lights, traffic signal, traffic striping and sodding. This project is on schedule for completion in June 2014**

    - Edmond, OK - Official Website - Current Construction Projects

  8. #8

    Default Re: Road Construction in Edmond

    Quote Originally Posted by Plutonic Panda View Post
    ''Kelly, north of Covell to south of Coffee Creek
    The Kelly Avenue parkway road construction project will begin Wednesday, July 17, 2013. The Kelly Avenue widening will start approximately 1000 feet north of Covell and will continue north to a point 350 feet south of Coffee Creek. The street will be widened to provide a four-lane divided roadway with left turns at all public streets. There will be a new traffic signal light at Kelly and Prairie Village Drive which will also serve as an additional access point into Mitch Park, Mathis Skate Park, and Cheyenne Middle School. The project also includes street lighting and landscaping. There will be 5 foot wide sidewalks on both sides of Kelly.

    The first phase of the project is to construct a new bridge just south of Coffee Creek adjacent to the Coffee Creek Golf Course. This will require the closing of Kelly Avenue to through traffic. Local traffic will have access to Hunters Pointe, Hunters Creek, Prairie Village and Coffee Creek Additions from the south end of the project via Covell, while the Villas at Hunters Creek Addition and the Coffee Creek Golf Course will have access from the north end of the project via Coffee Creek. It is anticipated that phase one will require 125 days to complete at which time the road will re-open to through traffic while work on the rest of Kelly will proceed. Formal detour route signs will be posted.

    The Oklahoma Department on Transportation (ODOT) awarded the project to Duit Construction Company of Edmond in the amount of $5,934,304. Project funding is 80% federal funds and 20% city funds. ODOT will administer and inspect the project. Edmond will have personnel available on the job site as necessary. The total project duration is 250 calendar days.

    Periodic lane closures may be necessary for some of the construction activity. Motorists are advised to use extreme caution and obey traffic signs and flagmen while traveling through the work zone as workers and equipment will be present''

    - Edmond, OK - Official Website - Current Construction Projects
    July 2014 Update: The contractor has finished the project and has called for a final inspection. The City will submit a list of items that the contractor will need to address before the City accepts the project. Contractor typically receives 30 days to complete the items on the list.

    - Edmond, OK - Official Website - Current Construction Projects

  9. #9

    Default Re: Road Construction in Edmond

    Quote Originally Posted by Plutonic Panda View Post
    ''Kelly, north of Covell to south of Coffee Creek
    The Kelly Avenue parkway road construction project will begin Wednesday, July 17, 2013. The Kelly Avenue widening will start approximately 1000 feet north of Covell and will continue north to a point 350 feet south of Coffee Creek. The street will be widened to provide a four-lane divided roadway with left turns at all public streets. There will be a new traffic signal light at Kelly and Prairie Village Drive which will also serve as an additional access point into Mitch Park, Mathis Skate Park, and Cheyenne Middle School. The project also includes street lighting and landscaping. There will be 5 foot wide sidewalks on both sides of Kelly.

    The first phase of the project is to construct a new bridge just south of Coffee Creek adjacent to the Coffee Creek Golf Course. This will require the closing of Kelly Avenue to through traffic. Local traffic will have access to Hunters Pointe, Hunters Creek, Prairie Village and Coffee Creek Additions from the south end of the project via Covell, while the Villas at Hunters Creek Addition and the Coffee Creek Golf Course will have access from the north end of the project via Coffee Creek. It is anticipated that phase one will require 125 days to complete at which time the road will re-open to through traffic while work on the rest of Kelly will proceed. Formal detour route signs will be posted.

    The Oklahoma Department on Transportation (ODOT) awarded the project to Duit Construction Company of Edmond in the amount of $5,934,304. Project funding is 80% federal funds and 20% city funds. ODOT will administer and inspect the project. Edmond will have personnel available on the job site as necessary. The total project duration is 250 calendar days.

    Periodic lane closures may be necessary for some of the construction activity. Motorists are advised to use extreme caution and obey traffic signs and flagmen while traveling through the work zone as workers and equipment will be present''

    - Edmond, OK - Official Website - Current Construction Projects
    August 2014 Update: Utility companies continue with relocation of lines to accommodate the upcoming roadway construction. Utility companies should be finished by October 1, 2014.


    - Edmond, OK - Official Website - Current Construction Projects

  10. #10

    Default Re: Road Construction in Edmond

    Covell Parkway update

    A redesign of the intersections of Covell and Bryant and Covell and Santa Fe with additional turn lanes has been identified as a priority by the City Council, City Engineer Steve Manek said at this week’s meeting of the Capital Improvements and Financing Task Force.

    The City Council in June directed staff to move forward on these projects with interim fixes to add turn lanes at an amount not to exceed $580,000 in design consulting fees.

    The task force voted 5-0 in favor of recommending to the City Council approval of the consulting fees. Triad Design Group serves as the city’s consultant for the Covell corridor. Triad would be held to a time frame for each phase of the project.

    “We got the consultants’ first blush attempt for design fees for the many millions of dollars of roadway construction last week,” Manek said. “It’s also a process to negotiate fees with engineers and so far we’ve been able to remove $22,000 in design fees.”

    The point is to come up with a set of plans to install turn lanes at the two Covell intersections, and then plan for applications for federal dollars at 80 percent of the cost to pay for road construction east on Covell beyond the interstate to Air Depot.

    - read much more here: Task force approves Covell design funds - The Edmond Sun: News

  11. #11

    Default Re: Road Construction in Edmond

    Coffee Creek Road Reconstruction set to begin this week

    Work to reconstruct a one mile section of Coffee Creek Road is slated to begin this week. The project is expected to take approximately two months to complete with cooperative weather.

    The area of Coffee Creek Road to be reconstructed is from Post Road to Westminster Road. The road will remain open during this time, but will be limited to local traffic only at times.

    This reconstruction is being conducted by Oklahoma County District #3 through an interlocal agreement with the City of Edmond. The county will supply labor and equipment for the job, while the city is providing materials at an estimated cost of $400,000.

    - Edmond, OK - Official Website

  12. #12

    Default Re: Road Construction in Edmond

    Additional Boulevard Mill and Overlay to begin next Monday

    Work to resurface a one and a half mile section of Boulevard Road is slated to begin Monday, October 6th. The project is expected to take approximately three weeks with cooperative weather.

    The area of Boulevard Road to be resurfaced is from 15th Street to the south city limits (just south of Smiling Hill Boulevard). The south bound lanes will be closed with traffic being rerouted to one lane each direction in the north bound lanes. Once the south bound lanes have been completed, work will begin on the north bound lanes with traffic diverted to the south bound lanes. Motorists should expect delays and are encouraged to find an alternate route if possible.

    This resurfacing is part of the scheduled 2014-15 Mill & Overlay projects for the City of Edmond. Atlas Paving is the contractor for these projects with a total cost of $3,977,174.

    - Edmond, OK - Official Website

  13. #13

    Default Re: Road Construction in Edmond

    2014 Construction Projects

    33rd and Broadway
    This project will provide for dual southbound and westbound left turn lanes, a single eastbound, westbound and southbound right turn lane. The entire intersection will be reconstructed in concrete pavement. Signal light modifications will accommodate the changes in lane configurations.

    This project is part of the 2000 Sales Tax Improvements. The estimated construction cost is $4,936,296.62. The funding split is 60% Federal funds and 40% City funds. The anticipated start date is summer/fall of 2014.

    2014 School Zone Safety Improvements
    This project will include school zone safety devices at locations not yet determined.
    This project will be funded with 100% City funds estimated to be $60,000.00. The anticipated start date is summer of 2014.

    "Share the Road" signage project
    This project will install traffic signs to warn motorists to watch for bicycles in the roadway.
    The signs will be posted on Boulevard from Clegern to the south City limits and on I-35 Frontage Roads from 2nd St to the south City limits. The project will be funded with 100% federal funds in the estimated amount of $86,700. The anticipated start date is summer/fall of 2014.

    - Edmond, OK - Official Website - 2014 Construction Projects

  14. #14

    Default Re: Road Construction in Edmond

    Future Construction Projects

    The following projects are under constant review and may be moved up or down in the scheduling depending on availability of funding and local priorities.

    Danforth Widening, Thomas to Fretz & Thomas Widening, Danforth to Covell
    This project will widen Danforth to a five lane roadway with a left turn lane into Edmond North High School and widen Thomas to a three lane roadway with turn lanes into both the North High School as well as John Ross Elementary. The project includes a signal light at Danforth and Thomas.

    The City will apply for 80% Federal funds with 20% City funds. Estimated construction cost is $4,890,628.85. The anticipated start date is unknown at this time.

    Covell Widening, Fairfax to I-35 Southbound on/off ramps
    This project will widen Covell to a four-lane divided roadway. There will be a section of widening east of Sooner six lanes wide to accommodate future commercial development. There will be left and right turn lanes at major commercial driveways. The project includes street lighting and a signal at Sooner and Covell.

    Estimated construction cost is $10,455,267.77. The City will apply for 80% Federal funds with 20% City funds. The anticipated start date is unknown at this time.

    15th and Broadway
    This project will evaluate the existing lane capacity to determine where additional lanes are needed. Signal light modifications will accommodate any changes in the lane configurations. This project is part of the 2000 Sales Tax Improvements.

    The estimated construction cost is $495,939.00. The funding split is 72% Federal funds and 28% City funds. The anticipated start date is unknown at this time.

    33rd Street, Coltrane to I-35
    This project consists of widening 33rd Street to provide for a four lane divided roadway with left turn lanes at the side streets. The center median will be landscaped. The project will also include multi-use paths/sidewalks.

    This project is part of the 2000 Sales Tax Improvements. The estimated construction cost is $3,911,046.26. The funding split will be 80% Federal funds and 20% City funds. The anticipated start date is unknown at this time.

    Danforth and Kelly
    This project will widen the intersection to a four lane divided road with dual left turn lanes and separate right turn lanes. The project extents will be approx 1400 feet east, west and south and 500 feet to the north.

    The estimated cost is $4,613,253.79. The City will apply for 80% Federal funds with 20% City funds. The anticipated start date is unknown at this time.

    Covell, Santa Fe to West City Limits
    This project will widen Covell to provide for a four lane divided roadway. There will be left turn lanes at all side streets. Covell will also include street lighting, bike paths and landscaping. Several new bridge structures will be required at the Santa Fe intersection.

    The estimated construction cost is $5,500,000. The City will apply for 80% Federal funds with 20% City funds. The anticipated start date is unknown at this time.

    Kelly, Coffee Creek to Waterloo
    This project will widen Kelly to a four lane divided roadway with left turn lanes at all side streets. The mile section from Sorghum Mill to Waterloo will not be divided. A signal light will be constructed at the intersections of Coffee Creek, Mesa Trail (Cross Timbers Elementary School), and Sorghum Mill Road. The project will also include street lighting and landscaping from Coffee Creek to Sorghum Mill.

    The estimated construction cost is $7,000,000.00. The City will apply for 80% Federal funds with 20% City funds. The anticipated start date is unknown at this time.

    Sooner Road Bridge Replacement, 0.6 Miles North of Covell Road
    This project will replace the existing bridge with a four lane bridge with sidewalks on both sides of the bridge and a trail underpass on both ends alongside Coffee Creek to accommodate the trails system.

    The estimated construction cost is $2,158,434.38. The City will apply for 80% Federal funds with 20% City funds. The anticipated start date is unknown at this time.

    2nd and Bryant
    This project consists of adding dual left turn lanes for all four directions as well as a single right turn lane for all four directions. New signal lights will be included. This project is part of the 2000 Sales Tax Improvements.

    The estimated construction cost is $3,811,731.86. The funding split and anticipated start date is unknown at this time.

    33rd and Technology Dr.
    This project will add left and right turn lanes on 33rd Street as well as a new signal light.

    The estimated construction cost is $2,250,000.00. The City will apply for 80% Federal funds with 20% City funds. The anticipated start date is unknown at this time.

    Phase 2, Intelligent Transportation System Broadway, Danforth, Covell, Santa Fe Corridor Project
    This project consists of installing fiber optic cable and replacing the traffic signal cabinets and controllers and associated signal equipment at 26 intersections on Broadway - 9th to Comfort, Danforth – Boulevard to Sherry, Santa Fe – Covell to Danforth and Covell – Broadway to Marilyn Williams in order to bring them into compliance with the National Transportation Communication for Intelligent Transportation System Protocol (NTCIP) standards. These intersections will connect to the Traffic Management Center via fiber optics and wireless communication network.

    The estimated construction cost is $2,947,625. The City will apply for 80% Federal funds with 20% City funds. The anticipated start date is unknown.

    Covell, Broadway to Fairfax
    This project will widen Covell to provide for a four lane divided roadway where possible. There will be left turn lanes at all side streets where possible. Covell may also include street lighting, 10 foot wide multi-use paths/sidewalks, and landscaping.

    The project is currently under design however, no construction funding is identified at this time. The estimated construction cost is unknown at this time.

    - http://edmondok.com/index.aspx?NID=802

  15. #15

    Default Re: Road Construction in Edmond

    I really wish Edmond would tackle more than one road project at a time. When I say road project, I mean a REAL one. It would be nice to see them just widen the entire stretch of Covell and get it done with. They don't need to do every listed project at once, but it would be awesome if they would do about 3-4 at a time.

  16. #16

    Default Re: Road Construction in Edmond

    ''Edmond's first bike lanes close to completion
    Published: September 19, 2013 by Diana Baldwin

    Construction of Edmond’s first designated bicycle lanes is almost finished along University Drive between Second Street and Chowning Avenue.
    Work on the striping and placement of the signage was being completed this week.

    University Drive was made into a two-lane road with a center turn lane and a bike lane on each side of the road. The project, including resurfacing, cost $697,054''

    Edmond's first bike lanes close to completion | News OK

  17. #17

    Default Re: Road Construction in Edmond

    Lil late for posting this, but here it is anyways; the project nearly complete.

    "Posted on: September 13, 2013
    Bryant Avenue Mill and Overlay to begin next Monday

    Work to resurface a one mile section of Bryant Avenue is slated to begin Monday, September 16th. The project is expected to take a maximum of seven working days to complete.

    The area of Bryant Avenue to be resurfaced is from Danforth Road to Covell Road. The road will remain open during this time, but motorists should expect intermittent lane closures.

    This resurfacing is part of the scheduled 2013 Mill & Overlay projects for the City of Edmond. Atlas Paving is the contractor for the project"

    - Edmond, OK - Official Website

  18. #18

    Default Re: Road Construction in Edmond

    ''Phase I, Intelligent Transportation System 2nd Street/Edmond Road Corridor Project
    This project consists of installing fiber optic cable and replacing the traffic signal cabinets and controllers and associated signal equipment at 22 intersections from Santa Fe Avenue, east to Saints Boulevard in order to bring them into compliance with the National Transportation Communication for Intelligent Transportation System Protocol (NTCIP) standards. The project will also include installation of wireless radios at four of the city water towers. These intersections will connect to the Traffic Management Center via fiber optics and wireless communication network.

    The estimated construction cost is $2,700,000. The funding split will be 80% Federal funds and 20% City funds. The anticipated start date is in the fall of 2013''

    - http://edmondok.com/index.aspx?NID=800

  19. #19

    Default Re: Road Construction in Edmond

    Quote Originally Posted by Plutonic Panda View Post
    ''Phase I, Intelligent Transportation System 2nd Street/Edmond Road Corridor Project
    This project consists of installing fiber optic cable and replacing the traffic signal cabinets and controllers and associated signal equipment at 22 intersections from Santa Fe Avenue, east to Saints Boulevard in order to bring them into compliance with the National Transportation Communication for Intelligent Transportation System Protocol (NTCIP) standards. The project will also include installation of wireless radios at four of the city water towers. These intersections will connect to the Traffic Management Center via fiber optics and wireless communication network.

    The estimated construction cost is $2,700,000. The funding split will be 80% Federal funds and 20% City funds. The anticipated start date is in the fall of 2013''

    - Edmond, OK - Official Website - Current Construction Projects
    An update on this: "The project will be advertised in October 2012 and awarded in January 2014"

  20. #20

    Default Re: Road Construction in Edmond

    Quote Originally Posted by Plutonic Panda View Post
    ''Phase I, Intelligent Transportation System 2nd Street/Edmond Road Corridor Project
    This project consists of installing fiber optic cable and replacing the traffic signal cabinets and controllers and associated signal equipment at 22 intersections from Santa Fe Avenue, east to Saints Boulevard in order to bring them into compliance with the National Transportation Communication for Intelligent Transportation System Protocol (NTCIP) standards. The project will also include installation of wireless radios at four of the city water towers. These intersections will connect to the Traffic Management Center via fiber optics and wireless communication network.

    The estimated construction cost is $2,700,000. The funding split will be 80% Federal funds and 20% City funds. The anticipated start date is in the fall of 2013''

    - Edmond, OK - Official Website - Current Construction Projects
    Another update on this:

    "Update: The Oklahoma Department of Transportation will advertise and award this project in January 2014 with construction starting in March 2014. "

    Note that it will be nice to have these lights synchronized.

  21. #21

    Default Re: Road Construction in Edmond

    Quote Originally Posted by Plutonic Panda View Post
    ''Phase I, Intelligent Transportation System 2nd Street/Edmond Road Corridor Project
    This project consists of installing fiber optic cable and replacing the traffic signal cabinets and controllers and associated signal equipment at 22 intersections from Santa Fe Avenue, east to Saints Boulevard in order to bring them into compliance with the National Transportation Communication for Intelligent Transportation System Protocol (NTCIP) standards. The project will also include installation of wireless radios at four of the city water towers. These intersections will connect to the Traffic Management Center via fiber optics and wireless communication network.

    The estimated construction cost is $2,700,000. The funding split will be 80% Federal funds and 20% City funds. The anticipated start date is in the fall of 2013''

    - Edmond, OK - Official Website - Current Construction Projects
    * Update: The Oklahoma Department of Transportation will advertise and award this project in March 2014 with construction starting in May 2014.

  22. #22

    Default Re: Road Construction in Edmond

    2015 Construction Projects
    Covell Widening, Fairfax to I-35 Southbound on/off ramp
    This project will widen Covell to a four-lane divided roadway. There will be a section of widening east of Sooner six lanes wide to accommodate future commercial development. There will be left and right turn lanes at major commercial driveways. The project also includes widening the intersection of Covell and Sooner and will include a signal light as well as street lighting throughout the project

    Estimated construction cost is $10,455,267.77. The City has secured 56% Federal funds in the amount of $5,905,800 with 44% of City funds in the amount of $4,549,467.77. The anticipated start date is unknown at this time.

    On edit: It would be nicer to see this pushed up to this summer. :/

  23. #23

    Default Re: Road Construction in Edmond

    Quote Originally Posted by Plutonic Panda View Post
    ''Phase I, Intelligent Transportation System 2nd Street/Edmond Road Corridor Project
    This project consists of installing fiber optic cable and replacing the traffic signal cabinets and controllers and associated signal equipment at 22 intersections from Santa Fe Avenue, east to Saints Boulevard in order to bring them into compliance with the National Transportation Communication for Intelligent Transportation System Protocol (NTCIP) standards. The project will also include installation of wireless radios at four of the city water towers. These intersections will connect to the Traffic Management Center via fiber optics and wireless communication network.

    The estimated construction cost is $2,700,000. The funding split will be 80% Federal funds and 20% City funds. The anticipated start date is in the fall of 2013''

    - Edmond, OK - Official Website - Current Construction Projects
    **Update: The Oklahoma Department of Transportation awarded this project on April 7, 2014 to Midstate Traffic Control, Inc. in the amount of $3,041,862.75 with construction starting in May 2014**

    Edmond, OK - Official Website - Current Construction Projects

  24. #24

    Default Re: Road Construction in Edmond

    Quote Originally Posted by Plutonic Panda View Post
    ''Phase I, Intelligent Transportation System 2nd Street/Edmond Road Corridor Project
    This project consists of installing fiber optic cable and replacing the traffic signal cabinets and controllers and associated signal equipment at 22 intersections from Santa Fe Avenue, east to Saints Boulevard in order to bring them into compliance with the National Transportation Communication for Intelligent Transportation System Protocol (NTCIP) standards. The project will also include installation of wireless radios at four of the city water towers. These intersections will connect to the Traffic Management Center via fiber optics and wireless communication network.

    The estimated construction cost is $2,700,000. The funding split will be 80% Federal funds and 20% City funds. The anticipated start date is in the fall of 2013''

    - Edmond, OK - Official Website - Current Construction Projects
    Update: The Oklahoma Department of Transportation awarded this project on April 7, 2014 to Midstate Traffic Control, Inc. in the amount of $3,041,862.75. Contractor is currently ordering equipment with construction starting in summer of 2014.

    - http://edmondok.com/index.aspx?NID=800

  25. #25

    Default Re: Road Construction in Edmond

    Quote Originally Posted by Plutonic Panda View Post
    ''Phase I, Intelligent Transportation System 2nd Street/Edmond Road Corridor Project
    This project consists of installing fiber optic cable and replacing the traffic signal cabinets and controllers and associated signal equipment at 22 intersections from Santa Fe Avenue, east to Saints Boulevard in order to bring them into compliance with the National Transportation Communication for Intelligent Transportation System Protocol (NTCIP) standards. The project will also include installation of wireless radios at four of the city water towers. These intersections will connect to the Traffic Management Center via fiber optics and wireless communication network.

    The estimated construction cost is $2,700,000. The funding split will be 80% Federal funds and 20% City funds. The anticipated start date is in the fall of 2013''

    - Edmond, OK - Official Website - Current Construction Projects
    August 2014 Update: Contract time began on Monday August 25, 2014. Contractor is currently trenching and boring for conduit installation at Edmond Rd and Santa Fe and working to the east.

    - Edmond, OK - Official Website - Current Construction Projects

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Road construction on wilshire...
    By Achilleslastand in forum Transportation
    Replies: 0
    Last Post: 01-15-2013, 10:31 PM
  2. Road construction
    By SoonerBoy18 in forum General Civic Issues
    Replies: 7
    Last Post: 05-07-2012, 11:54 AM
  3. Road Construction
    By j7m7l7 in forum Norman
    Replies: 9
    Last Post: 02-15-2012, 10:10 AM
  4. Help Please Info Road Construction
    By Karried in forum General Civic Issues
    Replies: 4
    Last Post: 10-07-2005, 05:15 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO