Just got a chance to listen to the presentation. Not sure about the rent but basically it's a 5-year base term with three 1-year renewal options. PSM hopes at that point will be ready for a purpose-built facility. As far as the exterior it sounds like it's pretty much stuck as-is for now besides PSM adding their signage. Best of luck to them.
Bookmarks