Bids at the end of the month so construction should start around the end of January.
17767
Type: Posts; User: Robert_M; Keyword(s):
Bids at the end of the month so construction should start around the end of January.
17767
Preliminary plans are out for this project.
17765
Two new 7-11 locations going into the following locations. Both will also have a Laredo Taco and are approximately 4,700 square feet. These two don't appear to have the Raise the Roost Chicken &...
The new location in Norman at 24th Ave. S.W. and Lindsey is now open for business.
Plans are out for this location with a physical address of 17901 N. May Ave. Approximately 4,700 square feet with a Laredo Taco and indoor seating.
The plans are out to bid for this project. The expected finish date provided appears to be mid to late November.
The Velvet Taco location in Norman has a sign up that says Training in Progress so they should be getting close to opening soon.
Plans are out for this project to bid as well as two others.
19251 North Pennsylvania Avenue
15107 North Santa Fe Avenue
101 N Wood Drive Okmulgee
Norman location on 24th and Lindsey swapped over last week. Took them a couple of days but no noticeable changes to the interior other than signage.
Here is the 3d view and floor plan for the Norman location.
16819
16820
That location will be within a mile if not closer to the local franchise owner's offices and with all the large business there it should do well.
Most of the work on the Memorial Target Apple pad is done. Just waiting for the general contractor to finish up a couple of things.
Not sure when it opened but drove by yesterday and this location is open for business.
Site work is moving along on the 24th and Lindsey location.
I searched and couldn't see a different thread on the topic and though this would be the best place to post. OCCHD has a project out to bid for a fast track testing and drive thru immunization center...
Drove by the Moore site this evening and a construction trailer is there and they have begun the dirt work and the staking.
Signage was up on the Main Street location yesterday and it looked close to being open.
Haven't seen any work yet on the actual site for Costco but the city has been getting utilities installed and have been laying the ground work for the road that will take S.W. 25th West and connect...
The property is still listed as being owned by Oncue. Driving by this afternoon there was a surveyor putting stakes down and several pieces of land moving equipment on the site. Looks like they are...
Sign on the 240 marquee says they are opening the 24th 11 - 8.
I'm not 100% sure but I think from what I saw of the plans there was a portion of the wall that did look into Round 1
Plans are out to bid to General Contractors with a bid date of August 25th. So possibly by the end of September they might get going with construction.
They have had the road on Telephone being tore up for several weeks now with what looks like utilities being run so they are probably going to be starting up soon hopefully.
What was the date on those plans if you have the full sheet Pete? Curious how long ago this was thought out.
Just posted this in the Tesla in Tulsa thread before I saw this one.
Tulsa is getting at least a Tesla Delivery and Service Center. Going in at 6010 S. 129th Ave. East. Currently set to bid the...
This is listed on the Domino website
DOMINO C-STORE #130
COMING SOON
1520 NW 32nd
Newcastle, OK 73065