Widgets Magazine
Page 8 of 8 FirstFirst ... 345678
Results 176 to 179 of 179

Thread: Access Oklahoma Turnpike Projects

  1. #176

    Default Re: Access Oklahoma Turnpike Projects

    Quote Originally Posted by W8N2SKI View Post
    I had a random question while driving on the new I-335 today. Isn't it weird that the exits/mile markers are numbered as if the road goes all the way to the state line? I feel like the exits/mile markers are numbered on most bypasses as to the end of that road. The exit numbers basically line up with those of I-35. It's like on I-240, the exits are numbered from 1 to 14.

    I am also guessing that since I-240 exit 1 is at the termination at I-44, they will have to renumber exits to extend it to the I-344 interchange. I guess matching the bypass exit numbers to the main route exit numbers eliminates the risk of having to renumber all the exits in the case of future expansions?

    Attachment 18700
    It looks like they did similar on 344, basically continuing the exiting numbers from 44/Turner Turnpike, though in that case it basically is the mainline continuing on like it were one turnpike, which for their mantence purposes it practically is. Since 44 was not really build as one road, as 35 and 40 had been, but badging a few ring road segments and multiple turnpikes to look like a planned long route so it has to exit onto itself multiple times in OKC and a couple times in Tulsa. Ironically if 44 had not happened at the time, may have ended up called our whole inner ring 240 decades before trying it with the mostly turnpike ring more recently.

    Also it google update maps, so 344 is now showing up north of 40, though does not have either 344 south of 40 or the 240 extension.

  2. #177

    Default Re: Access Oklahoma Turnpike Projects

    Quote Originally Posted by TornadoKegan View Post
    Google Maps Shows the Kickapoo as Interstate 335 Currently doesn't show the Kilpatrick as I 344 Yet
    I344 Now Shows in Google Maps. the I240 Expansion is yet to show

  3. #178

    Default Re: Access Oklahoma Turnpike Projects

    Construction signs going up at the Wellston exit on the Turner. An Access Oklahoma project or something else?

  4. #179

    Default Re: Access Oklahoma Turnpike Projects

    Quote Originally Posted by Mesta Parker View Post
    Construction signs going up at the Wellston exit on the Turner. An Access Oklahoma project or something else?
    A little of both. The OK66 overpass was scheduled to be replaced. When ACCESS OK came along, they were able to accelerate the project and add ramp improvements.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Oklahoma Turnpike Authority
    By Plutonic Panda in forum Transportation
    Replies: 727
    Last Post: 04-21-2024, 06:52 PM
  2. Replies: 886
    Last Post: 06-08-2022, 05:45 AM
  3. Oklahoma Interstate (Not Turnpike) Speed Limits
    By zachj7 in forum Current Events & Open Topic
    Replies: 11
    Last Post: 11-12-2014, 11:44 AM
  4. New projects proposed for Oklahoma River/Stockyards
    By Patrick in forum General Civic Issues
    Replies: 45
    Last Post: 07-14-2005, 07:21 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO