A majority of the windows on the 4th floor have already been replaced with new windows. You can also see that framing and sheet rock have already been installed. The room framing started on the top floor and they worked their way down. 3rd floor looks like it's far along also. Excited for this project to open up, we will have a cool little block area with the hotel and music hall.
Bookmarks