I've seen them jackhammering the concrete and then building up these inserts on both sides of the road, 3 per side, where each tire would run over them. Each row of these inserts is only a few meters apart. Then, once they are built up, they grate the road to level it. Even after grating the road you can still see the inserts in the concrete.

What are they? What do they do? What are they for?

Anyone else seen this?
Reply With Quote
  #2 (permalink)  
Old 07-02-2009, 08:10 PM
VIP Member
 
Join Date: Aug 2004
Total Posts: 3,179
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

Quote:
Originally Posted by Cid View Post
I've seen them jackhammering the concrete and then building up these inserts on both sides of the road, 3 per side, where each tire would run over them. Each row of these inserts is only a few meters apart. Then, once they are built up, they grate the road to level it. Even after grating the road you can still see the inserts in the concrete.

What are they? What do they do? What are they for?

Anyone else seen this?
I've been dying to know what's going on too. They're doing it all over the city.

Three little strips under each tread every few feet...

What is going on?
Reply With Quote
  #3 (permalink)  
Old 07-02-2009, 08:11 PM
Midtowner's Avatar
Gold Member
 
Join Date: Sep 2004
Total Posts: 9,500
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

I have no answer for you... but you just measured a distance in meters.
Reply With Quote
  #4 (permalink)  
Old 07-02-2009, 08:23 PM
CuatrodeMayo's Avatar
Participating Member
 
Join Date: Jul 2005
Total Posts: 1,854
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

COMMUNIST!!!

Over time, the concrete sections of the highway have moved and shifted up and down resulting in a rougher ride. The "inserts" are steel dowels that are being placed in the slots sawed into the concrete. These dowels help to tie the concrete sections of highway to each other, so they won't move as much. Once the dowels are in place, they can grind the highway smooth and keep it servicable for a few more years.

Hope that answers your questions.
Reply With Quote
  #5 (permalink)  
Old 07-02-2009, 08:24 PM
Participating Member
 
Join Date: Apr 2009
Total Posts: 114
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

They did this a couple years back or so all along the Kilpatrick turnpike. I'm not sure what they are for. Some kind of strengthening device?

edit: it seems we already know lol
Reply With Quote
  #6 (permalink)  
Old 07-02-2009, 09:26 PM
Participating Member
 
Join Date: Sep 2007
Total Posts: 139
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

As mayo said. They are placing stainless steel rods ( rather large ones) in each slot. I believe 6 per slab per joint. They keep the slabs from moving side to side and help reduce up and down movement. Once they put in the rods they fill the slots with cement. After that cures they mill the road with diamond studded gringing wheels. This makes for a very smooth ride but also puts a little texture on the surface for better traction in wet conditions. It is a very tedious and labor intensive job. But it will extend the life of the roadway for many many years. Without them the average serviceable life of a concrete road is about 30 years. This should extend the life for many more years. Depends on the condition when they do the retrofit. I believe all new concrete road construction has the rods placed from the beginning. Asphalt gives a smoother ride than concrete because they can do a seamless surface but it has a serviceable life of about a 1/3 of concretes life.
Reply With Quote
  #7 (permalink)  
Old 07-03-2009, 01:45 PM
bombermwc's Avatar
VIP Member
 
Join Date: Dec 2006
Total Posts: 1,330
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

They've done this everyone in OKC that has a concrete highway. I'm surprised you haven't seen it in other places....they've been doing this work for almost 10 years in various areas.

It's a method pioneered here BTW.
Reply With Quote
  #8 (permalink)  
Old 07-03-2009, 05:53 PM
fromdust's Avatar
VIP Member
 
Join Date: Jun 2005
Total Posts: 679
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

it sure has made for a much nicer ride on 40, thats for sure! now im not pissed off every time i drive it
Reply With Quote
  #9 (permalink)  
Old 07-03-2009, 05:59 PM
bluedogok's Avatar
Participating Member
 
Join Date: Aug 2006
Total Posts: 1,305
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

The expansive clay soils in OK are rough on all paving/foundations that comes in contact with it. It was quite an adjustment doing foundations on the limestone base here in Central Texas, they tend to be much lighter.
Reply With Quote
  #10 (permalink)  
Old 07-07-2009, 02:05 PM
DaveSkater's Avatar
Participating Member
 
Join Date: Jan 2009
Total Posts: 1,189
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

Do any of you know what the deal with the "wavy" bridges on the Kilpatrick turnpike (between I40 and the NW Expressway area) are all about? It would seem that they are settling or something. I wonder how long they'll last like that.....
Reply With Quote
  #11 (permalink)  
Old 07-07-2009, 02:22 PM
fromdust's Avatar
VIP Member
 
Join Date: Jun 2005
Total Posts: 679
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

Quote:
Originally Posted by DaveSkater View Post
Do any of you know what the deal with the "wavy" bridges on the Kilpatrick turnpike (between I40 and the NW Expressway area) are all about? It would seem that they are settling or something. I wonder how long they'll last like that.....
thats one of my biggest gripes. its called they cant effing build bridges in oklahoma, and those bridges have been that way since the day they opened.
Reply With Quote
  #12 (permalink)  
Old 07-07-2009, 03:04 PM
Participating Member
 
Join Date: Sep 2007
Total Posts: 139
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

Quote:
Originally Posted by DaveSkater View Post
Do any of you know what the deal with the "wavy" bridges on the Kilpatrick turnpike (between I40 and the NW Expressway area) are all about? It would seem that they are settling or something. I wonder how long they'll last like that.....
That was a construction flaw caused by the contractor hired to build the bridge(s). The contractor was fined heavily for the defect. The State was going to make them rebuild them, but it would have delayed the opening of the turnpike for another year and a half or so, therefore they just left it like it is now.
Reply With Quote
  #13 (permalink)  
Old 07-07-2009, 03:16 PM
DaveSkater's Avatar
Participating Member
 
Join Date: Jan 2009
Total Posts: 1,189
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

I worry about the safety issue, everytime I get behind a loaded semi (90,000lbs) and the hammering effect that has to cause the bridge.... Can't be a good thing
Reply With Quote
  #14 (permalink)  
Old 07-07-2009, 05:22 PM
Participating Member
 
Join Date: Apr 2009
Total Posts: 114
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

I love driving on those bridges. lol Its like a mini massage. But I also know that the bridge is simultaneously destroying my struts.
Reply With Quote
  #15 (permalink)  
Old 07-07-2009, 06:48 PM
bluedogok's Avatar
Participating Member
 
Join Date: Aug 2006
Total Posts: 1,305
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

I never noticed it in my pickup, it really shows up in my Z4 with a much shorter wheelbase and tighter suspension. We ran across worse on paving on grade on I-45 between Clear Lake and Galveston, my wife didn't like it at all.
Reply With Quote
  #16 (permalink)  
Old 07-07-2009, 11:58 PM
fromdust's Avatar
VIP Member
 
Join Date: Jun 2005
Total Posts: 679
Default Re: I-44 North of I-40 to Hefner Parkway: What are they doing?

Quote:
Originally Posted by yukong View Post
That was a construction flaw caused by the contractor hired to build the bridge(s). The contractor was fined heavily for the defect. The State was going to make them rebuild them, but it would have delayed the opening of the turnpike for another year and a half or so, therefore they just left it like it is now.
wow.... so the state rather have a half ass job than delaying the opening. that just burns me even more than driving on it.
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
North Park Mall Patrick OKC Metro Area Talk 31 07-15-2008 11:08 PM
North OKC Highway Interchange Questions worthy cook OKC Metro Area Talk 16 06-25-2008 12:51 PM
Lake Hefner Highlighted in Continental Mag floater OKC Metro Area Talk 0 03-27-2007 08:14 PM
Tree Planting Project along Lake Hefner Parkway... Who's In? okcpulse OKC Metro Area Talk 23 03-15-2005 01:18 AM
On-site Public Opinion Survey for Lake Hefner Park and Recreation Development Proactive Volunteer OKC Metro Area Talk 33 01-17-2005 06:30 PM


All times are GMT -5. The time now is 10:27 AM.


Copyright OKCTalk.com © 2004 - 2007

SEO by vBSEO 3.2.0