Quote:
Originally Posted by Spartan
John, I thought it was going to be a jumbotron.
|
Quote:
Prior to the 2008 football season
• South scoreboard: LED video display improvements and expansion within the entire existing structure (16mm HD capable video replay).
• Sound system replacement within the current board.
• Cost for this phase: $4.5 million.
|
From an OU/Daktronics press release.